Construction of double-circuit overhead line 400 kV Kromolice-Pątnów following the route of the 220 kV line Plewiska-Konin
Scope of works:
- Design engineering.
- Formal and legal matters.
- Disassembly of the existing 220 kV line Plewiska-Konin.
- Construction of double-circuit overhead 400 kV line.
- Inspection of the line with thermovision method and KORONA method.
Status of the project:
Completed
Client:
PSE S.A.
Implementation period:
2009 - 2012