Scope of works:
  1. Construction of the basic 110kV feeder line.
  2. Housing for 110/15/3kV transformer.
  3. Housing for 6-bay switchgear SN 15kV AC.
  4. Housing for switchgear 3kV DC.
  5. Housing for a set of rectifiers, input voltage of 110/15kV. Installation of the cell (-)  and electronic ground fault protection device.
  6. Housing for 230/400 V ACswitchgear.
  7. Housing for 220 V DCswitchgear.
  8. Housing for the set of batteries, charging rectifier, and inverter.
  9. Installation of feeder subordinations.
  10. Construction of the lines and devices for local and remote control with feeder cable disconnecting switch.
  11. Construction of the new traction substation building with LV installations and necessary infrastructures.
Status of the project:

Work-in-progress

Client: PKP Energetyka S.A.
Implementation period:

26.04.2022 – 25.11.2022