Scope of works:
  1. Housing for 15-bay, two-section switchgear SN 15kV AC.
  2. Housing for 23-bay switchgear 3kV DC.
  3. Housing for three sets of rectifiers, input voltage of 15kV.Installation of the cell (-)  and electronic ground fault protection device.
  4. Housing for two compensatory shunt reactors.
  5. Housing for switchgear 230/400 V AC.
  6. Housing for switchgear 220 V DC.
  7. Housing for the set of batteries, charging rectifier, and inverter.
  8. Construction of feeder cable line.
  9. Construction of return cables.
  10. Installation of feeder subordinations.
  11. Construction of the lines and devices for local and remote control with feeder cable disconnecting switch.
  12. Construction of the new traction substation building with LV installations and necessary infrastructures.
  13. Construction of 110kV switching station, with H5 layout, with two locations for 110/15 kV transformers and equipment, with traditional and modular design, supported on steel structures.
Status of the project:

Work-in-progress

Client: PKP Energetyka S.A.
Implementation period:

14.10.2020 – 30.04.2023