Reconstruction of 220 kV line Świebodzice-Klecina into 400+110 kV line from Wrocław station to Świebodzice station
Scope of works:
- Formal and legal matters.
- Construction design engineering.
- Construction and installation works along the single-circuit 400kV section, double-circuit 400/110kV section, single-circuit 110kV section.
- Anti-corrosion protection of the pylons.
- Reconstruction of interfering facilities.
Status of the project:
Completed
Client:
PSE S.A.
Implementation period:
2009 - 2012