Construction of 220 kV switching station within SE StalowaWolasubstation
Scope of works:
- Formal and legal matters.
- Design engineering.
- Construction of the new 220 kV switching station (GIS technology).
- Connecting a new 420 MW power block.
- Construction of a new building for indoor 220 kV switchgear.
- Assembly of new equipment in autotransformer bay.
- Construction of two bays for 220/110 kV 276 MVA transformer.
- Assembly of two new autotransformers 220/110 kV 275 MVA.
- Construction of auxiliary systems.
- Installation of technical protection system.
- Installation of secondary circuits for 220 kV switchgear and 110 kV autotransformer bays.
- Construction of new single circuit 220 kV line.
- Installation of new fibre optic connectors.
- General construction works.
Status of the project:
Completed
Client:
PSE S.A.
Implementation period:
2013 - 2017