Construction of 220 kV switching station within SE StalowaWolasubstation

Scope of works:
  1. Formal and legal matters.
  2. Design engineering.
  3. Construction of the new 220 kV switching station (GIS technology).
  4. Connecting a new 420 MW power block.
  5. Construction of a new building for indoor 220 kV switchgear.
  6. Assembly of new equipment in autotransformer bay.
  7. Construction of two bays for 220/110 kV 276 MVA transformer.
  8. Assembly of two new autotransformers 220/110 kV 275 MVA.
  9. Construction of auxiliary systems.
  10. Installation of technical protection system.
  11. Installation of secondary circuits for 220 kV switchgear and 110 kV autotransformer bays.
  12. Construction of new single circuit 220 kV line.
  13. Installation of new fibre optic connectors.
  14. General construction works.
Status of the project: Completed
Client: PSE S.A.
Implementation period:

2013 - 2017