Construction of 400 kV power line Jasiniec – GrudziądzWęgrowo
![Image](https://grinea.eu/wp-content/uploads/2022/07/Jasiniec-Grudziadz_1.jpg)
![Image](https://grinea.eu/wp-content/uploads/2022/07/Jasiniec-Grudziadz_2-1.jpg)
![Image](https://grinea.eu/wp-content/uploads/2022/07/Jasiniec-Grudziadz_6.jpg)
Scope of works:
- Formal and legal matters.
- Construction design engineering.
- Construction of foundations for supporting structures.
- Delivery and assembly of steel towers, with anticorrosion protection.
- Delivery and assembly of insulators and conductors.
- Stringing of phase conductors.
- Delivery and installation of OPGW cables.
Status of the project:
Completed
Client:
PSE S.A.
Implementation period:
2014 - 2022