Realised projects
Extension of 400/110 kV Płock substation
![Image](https://grinea.eu/wp-content/uploads/2022/07/SE-Plock_1.jpg)
![Image](https://grinea.eu/wp-content/uploads/2022/07/SE-Plock_2.jpg)
![Image](https://grinea.eu/wp-content/uploads/2022/07/SE-Plock_4.jpg)
![Image](https://grinea.eu/wp-content/uploads/2022/07/SE-Plock_6.jpg)
![Image](https://grinea.eu/wp-content/uploads/2022/07/SE-Plock_7.jpg)
Scope of works:
- Formal and legal matters.
- Construction design engineering.
- Construction of a new technical building.
- Assembly of supporting structures for 400 kV equipment.
- Modernisation of primary and secondary 400 kV and 110 kV circuits.
- Construction of new auxiliary switching stations 220 VDC, 220 VAC and 48 VDC.
- Modernisation of telecommunications and IT infrastructures
- Technical protection system for the station.
- Installation of earthing grid.
- General construction works.
Status of the project:
Completed
Client:
PSE S.A.
Implementation period:
2013 - 2017