Construction of 110 kV power line NowyŻmigród-Iwonicz

Realised projects

Construction of 110 kV power line NowyŻmigród-Iwonicz in the frames of the project"Construction of 110 kV line NowyŻmigród-Iwoniczto enable advancement of renewable energy services in the southern part of the Podkarpackie Region”

Scope of works:
  • Construction of 118 cast/pile foundations.
  • Construction of 118 pylon structures.
  • Construction of 25.278 km phase conductors andOPGW.
  • Construction of two sections of 110kV earth cables.
  • Clearing the area designated for the project.
Status of the project: Completed
Client: PGE Dystrybucja S.A
Implementation period:

29.05.2020 – 30.05.2022

Read More
Bydgoszcz Pila 1

Construction of 400 kV power line Bydgoszcz Zachód – Piła Krzewina

Realised projects

Construction of 400 kV power line Bydgoszcz Zachód – Piła Krzewina

Scope of works:
  • Formal and legal matters.
  • Construction design engineering.
  • Construction of foundations for supporting structures.
  • Delivery and installation of steel towers, with anticorrosion protection.
  • Delivery and assembly of insulators and conductors.
  • Stringing of phase conductors.
  • Delivery and installation of OPGW cables.
  • Reconstruction of facilities interfering with the new line.
Status of the project: Completed
Client: PSE S.A.
Implementation period: 2012 - 2021
Read More
Jasiniec Grudziadz 1

Construction of 400 kV power line Jasiniec – Grudziądz Węgrowo

Realised projects

Construction of 400 kV power line Jasiniec – GrudziądzWęgrowo

Scope of works:
  • Formal and legal matters.
  • Construction design engineering.
  • Construction of foundations for supporting structures.
  • Delivery and assembly of steel towers, with anticorrosion protection.
  • Delivery and assembly of insulators and conductors.
  • Stringing of phase conductors.
  • Delivery and installation of OPGW cables.
Status of the project: Completed
Client: PSE S.A.
Implementation period: 2014 - 2022
Read More
Swiebodzice Wroclaw 1 1

Reconstruction of 220 kV line Świebodzice-Klecina into 400+110 kV line from Wrocław station to Świebodzice station

Realised projects

Reconstruction of 220 kV line Świebodzice-Klecina into 400+110 kV line from Wrocław station to Świebodzice station

Scope of works:
  • Formal and legal matters.
  • Construction design engineering.
  • Construction and installation works along the single-circuit 400kV section, double-circuit 400/110kV section, single-circuit 110kV section.
  • Anti-corrosion protection of the pylons.
  • Reconstruction of interfering facilities.
Status of the project: Completed
Client: PSE S.A.
Implementation period: 2009 - 2012
Read More
Kromolice Patnow 1

Construction of double-circuit overhead line 400 kV Kromolice-Pątnów following the route of the 220 kV line Plewiska-Konin

Realised projects

Construction of double-circuit overhead line 400 kV Kromolice-Pątnów following the route of the 220 kV line Plewiska-Konin

Scope of works:
  • Design engineering.
  • Formal and legal matters.
  • Disassembly of the existing 220 kV line Plewiska-Konin.
  • Construction of double-circuit overhead 400 kV line.
  • Inspection of the line with thermovision method and KORONA method.
Status of the project: Completed
Client: PSE S.A.
Implementation period: 2009 - 2012
Read More