Construction of 110 kV power line NowyŻmigród-Iwonicz
Realised projects
Construction of 110 kV power line NowyŻmigród-Iwonicz in the frames of the project"Construction of 110 kV line NowyŻmigród-Iwoniczto enable advancement of renewable energy services in the southern part of the Podkarpackie Region”




Scope of works:
- Construction of 118 cast/pile foundations.
- Construction of 118 pylon structures.
- Construction of 25.278 km phase conductors andOPGW.
- Construction of two sections of 110kV earth cables.
- Clearing the area designated for the project.
Status of the project:
Completed
Client:
PGE Dystrybucja S.A
Implementation period:
29.05.2020 – 30.05.2022
Construction of 400 kV power line Bydgoszcz Zachód – Piła Krzewina
Realised projects
Construction of 400 kV power line Bydgoszcz Zachód – Piła Krzewina



Scope of works:
- Formal and legal matters.
- Construction design engineering.
- Construction of foundations for supporting structures.
- Delivery and installation of steel towers, with anticorrosion protection.
- Delivery and assembly of insulators and conductors.
- Stringing of phase conductors.
- Delivery and installation of OPGW cables.
- Reconstruction of facilities interfering with the new line.
Status of the project:
Completed
Client:
PSE S.A.
Implementation period:
2012 - 2021
Construction of 400 kV power line Jasiniec – Grudziądz Węgrowo
Realised projects
Construction of 400 kV power line Jasiniec – GrudziądzWęgrowo



Scope of works:
- Formal and legal matters.
- Construction design engineering.
- Construction of foundations for supporting structures.
- Delivery and assembly of steel towers, with anticorrosion protection.
- Delivery and assembly of insulators and conductors.
- Stringing of phase conductors.
- Delivery and installation of OPGW cables.
Status of the project:
Completed
Client:
PSE S.A.
Implementation period:
2014 - 2022